Region: Europe      US   Asia   India   Australia
You are not logged in    Login
IDS Water
The Information Resource for the Water Industry!
Browse Water Products and Suppliers by Category
Browse Water Whitepapers By Sector
Browse Water Events By Category
Participation Options 1
Free Listing
Interested in Exhibiting?
SubmitEvents
About IDS Water
Submit News
Subscribe to Water Newsletter
News ReleaseClick Here to view News Releases
Water Bureau Temporarily Turns Off Bull Run Water Supply
News Source
Salem-News.com
November 14, 2008
Click HereView Participation Packages
Click Here
Submit News
   




   

The Water Bureau will rely on the secondary source as long as weather conditions and water quality dictate.

The Portland Water Bureau turned off the Bull Run water supply system this morning due to increased turbidity in the watershed. The bureau activated groundwater wells in the Columbia South Shore Well Field to temporarily serve water to Portland. Recent heavy rains and increased stream flows in the Bull Run watershed have contributed to this rapid increase in turbidity. Turbidity is a measurement of the cloudiness of (drinking) water by suspended particles. Portland is one of six large drinking water systems in the country that does not filter its water supply. The city is able to comply with federal drinking water regulations by continuously meeting a set of filtration avoidance criteria.

Portland has been able to consistently meet these criteria, but it occasionally has to shut down the Bull Run system and operate from its backup groundwater supply when storms and other natural disturbances in the Bull Run reservoirs increase the turbidity. The Surface Water Treatment Rule requires that the city not serve drinking water exceeding a turbidity level of 5 Nephelometric Turbidity Units (NTU). "Stream levels rose rapidly overnight resulting in a spike in turbidity at Headworks (treatment facility). Although stream levels have crested, turbidity levels continued to rise through the morning. We are taking this proactive step to ensure that we continue to serve the high quality water that we strive to provide." said Water Bureau Administrator David Shaff.

"Activating the Well Field allows us to continue providing extremely high quality drinking water to our customers despite turbid conditions in the watershed." The Columbia South Shore Well Field is a high quality water supply which meets or surpasses all federal and state drinking water regulations. The Water Bureau will run the Well Field as long as weather conditions and water quality dictate. The Water Bureau's Web site (portlandonline.com/water) provides further information about both the Bull Run and the Columbia South Shore Well Field under the "Portland's H2O" tab.

Other News
Coca-Cola Foundation Gives $1M to Water Solutions Projects
Crystal Springs Bottled Water Company Acquires Blue Ridge Mountain Water
ORC Launches New Look Water Info Website
Ten Water Quality Projects Chosen to Reduce Gulf Dead Zone
WASA to Launch 6 Water Schemes
Featured Whitepaper
Boron Removal in Seawater RO Desalination

In the seawater desalination field, WHO requires the boron concentration in...

                     Read more

 

Industry IDS Inc.
Association of Water Technologies European Water Association FLUIDEX Global Water Intelligence International Desalination Association
IRC International Water and Sanitation Centre ISTT UKSTT Water Supply & Sanitation Collaborative Council IBWA
DELEGATES
47717
Conference Sectors  Case Studies  List of Papers  Exhibition Sectors  Vendor Presentation  List of Exhibitors  Industry News  Sponsors  All Exhibitors  All Papers  Sitemap  Registration Links ]

 :: IDS Emergency Management :: IDS Packaging ::IDS Publishing / Media::IDS Healthcare Management::IDS Environment::IDS Plastics::IDS Power/Energy:: 

Industry IDS, Inc. – Online Tradeshow, Exhibition, & Buyers Guide Solutions